Pages

Saturday, May 7, 2016

CENTRALIZED WATER TREATMENT SYSTEM - Water Source: Fresh (non-salty) clear ground water with manifestations of odor, sediments and hardness





CENTRALIZED WATER treatment SYSTEM

Equipment Composition:                                

One (1) unit 80 gals Steel-Body Bladder Pressure               Tank
One (1) unit Houston 1.5 hp WAF15 Convertible                 Centrifugal Pump               
One (1) unit Auto Pump Control/Flow Sensor
One (1) unit Air Pump
One (1) unit Multimedia Filtration System with                   Automatic Digital Head Valve
One (1) unit Highly Activated Carbon Filter with                 Automatic Digital Head Valve
One (1) unit Water Softener & Conditioner with                 Automatic Digital Head Valve
One (1) unit Brine Tank
                              

Water Source: Fresh (non-salty) clear ground 
        water with manifestations of odor, sediments             and hardness

Specifications and Feature Highlights:
            
Product Water: Filtered and soft water from every             faucet;      
Auto Pump Control / Flow Sensor - protects pump             by automatically turning it on/off upon 
        presence / absence of water pressure      
High Power 1.5 hp Convertible Pump Fiberglass Pressure Tank – 80 gals Maintenance-free Bladder             Tank delivers constant pressure & volume
Aeration System removes foul odor form water
Centralized Multimedia Filter - Removes macro                   sediments & particles                           Centralized Activated Carbon Filter - Removes                   microorganisms; clear & clean water from 
        every faucet within the house             Centralized Water Softener & Conditioner - 
Prevents scaling of fixtures; rain-soft water from
  every faucet within the house
Automatic Backwash & Regeneration – periodically             cleans and regenerates filter and softener


Scope of Work:

Design, lay-out, installation and commissioning of             Water Treatment System
Technical orientation of personnel-in-charge prior               turn-over

Terms & Conditions:  

One (1) year warranty coverage on 
        non-consumable items
Periodic check-up within warranty period
Technical support within and after warranty 
        coverage period 


 td1

No comments:

Post a Comment