Pages

Tuesday, April 26, 2016

CENTRALIZED WATER TREATMENT SYSTEM - Puricare Industrial Enterprises Water Treatment Systems - Aganan, Pavia, Iloilo




CENTRALIZED WATER TREATMENT SYSTEM 


·  Equipment Composition:

MULTI-MEDIA Filtration System
           
            One (1) unit 10x54 FRP Tank Housing capped with 
               One (1) unit Multi-Port Valve Head with Digital                 Automatic Backwash System
     
HIGHLY ACTIVATED CARBON FILTRATION System
           
            One (1) unit 10x54 FRP Tank Housing capped with
                One (1) unit Multi-Port Valve Head with Digital                       Automatic Backwash System

      Water Softening & Conditioning System
               
         One (1) unit 10x54 FRP Tank Housing capped with
                One (1) unit Multi-Port Valve Head with Digital                       Automatic Regeneration System
         Brine Tank Assembly

      Ancillaries        
         One (1) unit Aqua Tedela 1.3 hp Centrifugal Pump
         One (1) unit Automatic Pump Control                       
     

·   Features and Benefits:

    Product Water:  FILTERED, SOFT AND CONDITIONED WATER

Centralized installation supplies filtered and softened            water from every faucet within the residence

Multi-Media filtration removes sediments, and   
       suspended particles from raw water

Highly Activated Carbon removes pathogens and     
       microorganisms from raw water

Water Softener conditions water for that ‘rain-soft’ 
       product water

Automatic Backwash-Regeneration System renews 
       filter and softener beds without human intervention

    Backed by one (1) year warranty coverage and after-  
           sales technical support, 

     Availability of all parts
                                               

·   Source Water:  Ground well (with apparent sediments   
         and hardness)
  
·     Scope of Work: 
       Design, lay-out, installation and commissioning                      of Water Treatment System
       Technical orientation of personnel-in-charge prior 
           turn-over


·  Terms and Conditions: 
        One (1) year warranty coverage
        Periodic check-up within warranty period

       Technical support within and after warranty coverage
            period 
sr1

No comments:

Post a Comment